Before installing the ring ditch cover, it is essential to inspect the quality of the cover, particularly its strength class, to ensure it meets the design specifications. The cover should be free from cracks, chipped edges, honeycombing, pockmarks, and any straight seams in the middle. This ensures both structural integrity and a visually appealing finish.
A photo of an athletic field is provided below for reference:

During installation, the top surface of the wall must be cleaned and moistened to ensure proper adhesion. Two key aspects to control are the elevation and the alignment of the drainage holes on the cover plates. Proper elevation is crucial for smooth drainage across the entire plastic surface, while aligned drainage holes contribute to the overall aesthetics of the field. Therefore, it's important to establish an elevation control line during installation.
Each cover plate must be laid flat, with consistent elevation and firmly secured. After placing the first cover plate, another one should be installed every 10 meters as a direction control board. By pulling a line through the central drainage holes of these two plates, you can use this as a reference for midline control. If misalignment occurs, adjustments should be made carefully, ensuring that the centerline remains undisturbed. This process involves four continuous steps: positioning, adjusting, aligning, and maintaining accuracy throughout the installation.
The main focus during the installation of the ring ditch is on elevation and centerline alignment, which directly affect the functionality and visual appeal of the site. In addition, the installation must be stable, with tight joints and properly filled mortar. It is also important to clean the bottom of the trench before placing the cover plates to ensure a solid base.
Here are the quality requirements for the installation of prefabricated reinforced concrete covers:
Prefabricated Reinforced Concrete Cover Installation Quality Requirements
Project |
Allowable Deviation (mm) |
Test Frequency |
Testing Method |
Range |
Points |
Centerline Offset |
≤5 |
10m |
1 |
A small amount of thread |
Height Difference Between Two Adjacent Boards |
3 |
10m |
1 |
Using ruler |
Plate Bottom Wall Length |
±10 |
10m |
1 |
Use ruler |
Sheet Seam Filling Mortar |
Full |
10m |
1 |
Observed |
Note: The strength grade of the prefabricated reinforced concrete cover plate must meet the design requirements, and the appearance should be free from cracks, chipping, or other defects.
LED Front Lit Halo Lit Letters
We are a factory direct outlet in A.D industry, more than 13 years experience.
Main produce advertising signs, such as lightbox, luminous letters, directory and Wayfinding Sign, aluminum profile sign,waste bin,mail/parcel drop box and some project sign.
Make it easily to our customer
Contact us →A reference picture or your design→Size information→Confirm the size and material→You will get our best offer.
FAQ
Q: Are you a trading company or factory?
A: We are factory.
Q: What is the MOQ?
A: No MOQ required normally, that means you can always ask for a sample first. But remember the sample freight is at your own cost.
Q: Do I have to have a design to inquire?
A: Yes! A well made design/artwork is the most helpful thing to get an exact quote. However, if you really do not have a design...just let us know your idea, we'll cover it.
Product name: LED Frontlit Halo Lit Letters
Marterial: stainless steel+acrylic
Size: customize
Color: customize
Warranty: 1 year
Led Letters,Front Lit Letters,Halo Lit Letters,Led Front Lit Halo Lit Letters
Chengdu GodShape Sign Co., Ltd , https://www.signsgs.com